Proposed work includes replacing the deck on the Rush River bridge
The Wisconsin Department of Transportation (WisDOT) is seeking public input on a proposed rehabilitation project on the bridge that carries WIS 29 over the Rush River between River Falls and Spring Valley in Pierce County.
The public is invited to go to the project website, review information about the proposed work and submit comments by Nov. 30, 2026, by:
Built in 1961, the bridge is in need of maintenance. WisDOT is proposing:
Replacing the bridge deck
Repairing the substructure
Replacing the joints
Replacing the bearings
A bridge substructure is the portion of the bridge below the deck — primarily abutments, piers and foundations — that transfers all loads from the superstructure — the portion of the bridge that carries the traffic and spans between the supports — safely into the ground.
Currently, WIS 29 is anticipated to be closed for construction, with through traffic being detoured.
Construction currently is scheduled for 2030.
Motorists are reminded that using handheld cell phones in Wisconsin work zones is illegal. Alerts and updates provided via these sites are not intended for use while driving. When driving, your focus should always be on driving.
For more information regarding traffic impacts, transportation news and improvement project updates in Wisconsin’s Northwest Region:
This content is sourced from
Wisconsin Department of Transportation
. It reflects the author's views and has not been edited by our newsroom. It may have been generated using AI assistance.